China Supplier Evaluation: 7-Step Checklist Before You Pay
Most buyers who lose money in China do not lose it to a dramatic scam. They lose it to a supplier that looked legitimate, answered emails quickly, quoted a good price — and simply could not deliver what was promised. The factory was smaller than claimed. The "manufacturer" was a trading company that subcontracted the order three times. The certificate belonged to a different product. The bank account belonged to a different company.
That is why supplier evaluation happens before the first payment, not after the first problem. A licence check, a scope reading, a sample test and a bank-account match together take an afternoon and cost almost nothing — and they remove most of the suppliers a paid audit would have rejected anyway. This guide gives you that sequence as a 7-step checklist, in the order that costs you least to run. Each step tells you what evidence to ask for, what counts as a pass, and what to do if the supplier fails.
This is not a guide to finding suppliers. If you are still searching for candidates, start with a supplier search first. This guide starts where the search ends: you have a shortlist — usually two or three names — and you need to decide which one gets your money.
Key Takeaways
- Evaluate in order, cheapest first. Desk checks (licence, registry, scope) cost nothing and remove most bad candidates. Spend money on samples and audits only on the suppliers that survive them.
- Four names must match: the business licence, the proforma invoice, the contract, and the bank account. If any one differs, stop and get a documented explanation before you send money.
- A valid business licence does not prove a factory. Read the business-scope line: "manufacturing" means they can legally make your product; "trading" alone means they buy and resell it. Both can be legitimate — but they are different businesses with different risks.
- A sample is a test, not a souvenir. Test it against a written specification — dimensions, material, function, finish, packaging — and photograph every difference before you approve bulk production.
- The standard first-order payment shape is 30% deposit with 70% after a pre-shipment inspection. Never pay 100% upfront to a supplier you have not bought from before.
The 7 Steps at a Glance
| Step | What you check | Evidence to ask for | Time and cost | If it fails |
|---|---|---|---|---|
| 1 | Business licence and identity | Business licence scan, 18-character Unified Social Credit Code | 5–30 minutes, free | Walk away if the name or code does not match the registry |
| 2 | Factory vs trading company | Business-scope line, registered vs production address, live factory video | 30 minutes, free | Re-price the deal as a trader, or find a real factory |
| 3 | Capability and capacity | Equipment list, production-line video, capacity maths, recent similar orders | 1–2 hours, free | Reduce the order, or split it across two suppliers |
| 4 | Sample and test properly | A sample made to your written specification, plus test reports | 1–3 weeks, sample cost plus freight | Fix the spec and re-sample once; then move on |
| 5 | Price and cost breakdown | Itemised quotation: unit price, tooling, packaging, inspection, freight terms | 1 day, free | Demand the breakdown in writing; compare like with like |
| 6 | Payment terms and contract | Written contract, proforma invoice, bank account details, payment milestones | 1 day, free | Do not pay until the paperwork names the same company |
| 7 | Inspection before final payment | Pre-shipment inspection at 80–100% production, AQL standard agreed in advance | 1–2 inspector-days, market-reported roughly USD 150–300 per day | Hold the final payment until the inspection passes |
Run the steps in this order. Steps 1 and 2 are free desk checks — do them for every supplier on your shortlist. Steps 3 to 6 need the supplier's cooperation, so run them only on the one or two candidates that survived. Step 7 happens after production, and it protects the largest payment you will make.
Step 1: Verify the Business Licence and Identity
Every Chinese company has a legal identity that you can check yourself, without the supplier's permission and without paying anyone. This is the single highest-value check in the whole list, and it takes about twenty minutes.
What to ask for: a scan of the business licence, the full Chinese company name, and the 18-character Unified Social Credit Code. Then search the code on the National Enterprise Credit Information Publicity System (gsxt.gov.cn), China's official company registry. Commercial databases such as Qichacha or Tianyancha are faster to search, but the official registry is the source — confirm anything that matters there.
What to read on the registry entry:
- Registration status. Is the company active right now? A status of cancelled, revoked, or "moved out" means the company does not legally exist in its current form. Do not pay it.
- Establishment date. This is the real age of the company, not the story in the sales email. A supplier claiming 15 years of experience that was registered two years ago is exaggerating.
- Abnormal operations and serious violations. The registry has separate sections for these. Any entry here is a stop sign until you understand it.
- Registered capital. This is not proof of wealth — registered capital in China is often unpaid — but a very small capital figure against a very large order is worth noting.
The four-names rule. The legal company name on the licence must be the same name on the proforma invoice, the same name on the contract, and the same name on the bank account. Four documents, one name. If any of them differs, stop and get a documented explanation before you send money. A supplier that changes its bank account by email alone — especially to a personal account or a third company — is the most common payment-fraud pattern in this business. Confirm any change of bank details by video or phone call, never by email alone.
Pass: the company exists, is active, was established long enough to match its claims, has no abnormal-operations entry, and the name matches across the licence, invoice, contract and bank account.
Fail: the name or code does not match the registry, the status is cancelled or revoked, or the bank account belongs to a different name. This failure is not fixable — walk away.
Step 2: Check Factory vs Trading Company
A registered company is not automatically a factory. Many legitimate Chinese suppliers are trading companies — they buy from factories and resell. That is not a scam. But a trading company quoting factory prices, with factory lead times, and no factory of its own, is a different deal from the one you think you are signing. Know which one you are dealing with before you negotiate.
What to ask for:
- The business-scope line on the licence. This is the fastest factory-versus-trader signal on paper. A scope that includes manufacturing or production terms means the company is registered to make things. A scope that mentions only trading, technology, or services — with no manufacturing term — means the company is not registered as a manufacturer. It may still control a factory through a related company, but that is a claim you must verify separately.
- Two addresses. Ask for the registered address on the licence and the production address where your order will actually be made. A registered address in an office tower, with a production address in an industrial zone in another city, is normal — but a supplier that cannot name a production address at all is not a factory.
- A live video walkthrough. Ask for a short video walking from the factory gate to the production line, on a normal weekday, with today's date written on a piece of paper visible in frame. Catalogue photos and a polished showroom video prove nothing — a showroom is cheap to stage. A live, unscripted walk of a working floor, with machines running and workers at stations, is expensive to fake. If the supplier refuses, or sends the same video three times, that is a finding.
Three more cross-checks that cost nothing:
- Product-to-city match. Does the city actually make your product? A sofa factory in Foshan, an office-chair factory in Anji, an electronics factory in Shenzhen — these are real clusters. A supplier claiming to make your product in a city with no industry for it is worth a harder look.
- The 1688 cross-check. Search the factory's Chinese company name on 1688.com, China's domestic wholesale platform. Real factories usually have a domestic presence.
- What do they make in-house? Ask directly: "For this product, which steps do you do in your own factory, and which do you outsource?" A factory that answers "everything" is not answering. A real factory names its processes and its subcontractors.
Pass: the scope line includes manufacturing (or the supplier is openly a trader and prices itself as one), the production address is a real industrial site, and the live video shows a working floor.
Fail: the supplier claims to be a factory but the scope is trading-only, the production address is an office building, or no live video is ever produced. If you still want the product, re-price the deal as a trader relationship — expect a margin on top of the factory price and less control over quality — or find a real factory.
Step 3: Audit Capability and Capacity
A real factory can still be the wrong factory. Capability means the plant can make your product to your specification. Capacity means it can make your quantity on your timeline. Both fail quietly: the order is accepted, production starts late, and the goods arrive in the wrong material, the wrong size, or three weeks after the deadline.
What to ask for:
- An equipment list. Which machines, how many, what age, what condition? Ask for the nameplates on the key machines — a machine nameplate is hard to fake and tells you the real capability. For a machined part, that means the machine's travel against your part envelope and the calibration status of its measuring equipment.
- The last three similar products. Ask the factory to describe the last three products it manufactured that are similar to yours. A factory that has made your product category before will answer in specifics — materials, tolerances, quantities, problems solved. A factory that has never made it will answer in generalities.
- Capacity maths. Ask for the numbers, not a promise: how many units per day on the line that will make your order, how many orders are already on that line, and what date your order would start and finish. Then do the arithmetic yourself. If the line makes 500 units a day and your order is 10,000 units, that is 20 working days before inspection and packing — not the 10 days in the quotation.
- Quality system. Ask who runs quality control, how many inspectors, and what happens to a batch that fails. A factory with a named QC process and a written rejection procedure is a different operation from one where "the boss checks everything."
The engineering conversation test. Send one technical question that requires real engineering knowledge — not a question a salesperson can answer from a catalogue. For a Bluetooth speaker factory: how do they handle enclosure resonance below 200 Hz? The quality of the answer tells you whether you are talking to the production team or the sales team.
Pass: the equipment fits your product, the factory has made similar products, the capacity maths supports your quantity and deadline, and there is a named QC process.
Fail: the capacity maths does not add up, the factory has never made your category, or every technical question gets a sales answer. Reduce the order to what the capacity supports, split it across two suppliers, or move on — do not let a factory learn your product on your order.
Step 4: Sample and Test Properly
A sample is the cheapest test in the whole process and the one most buyers rush. Order it before any bulk order — and treat it as a test, not a souvenir. A sample that arrives and looks nice is not a passed sample. A sample that arrives, is measured against a written specification, and matches it, is.
What to do:
- Write the specification first. Dimensions, material (species, grade, composition — not just "solid wood" or "cotton"), tolerances, colour, finish, function, packaging, labelling, and the standard it must meet. Send this specification to the supplier before the sample is made. A sample made to no specification proves nothing.
- Order a full sample, not a swatch. For furniture, that means a full piece. For electronics, a working unit. For garments, a finished garment in your size and fabric. A fabric swatch cannot tell you whether the stitching holds.
- Test three units, not one. The first unit a factory sends is often the best one it can make. Ask for three units from the same batch and test all three. Differences between them tell you more about the factory than any single perfect piece.
- Test what your customer will test. Sit on the sofa. Open the drawer. Charge the power bank fully and discharge it — a label that says 10,000 mAh and delivers 5,000 is a common problem. Wash the garment three times and measure shrinkage. Check the certification marks on the product and the packaging, and ask to see the certificate behind them.
- Photograph every difference. Measure, photograph and write down each difference from the specification, and send the list to the supplier before you approve bulk production.
Sample costs. Market-reported sample costs vary widely by product — roughly USD 100–500 per piece for furniture, and lower for small accessories — plus freight. Agree in writing before the sample is made: who pays for the sample, who pays the freight, whether the sample cost is credited against the bulk order, and what happens if the sample fails. A supplier that charges a high sample fee and refuses to credit it is pricing the sample as a profit line, not as a step toward an order.
Pass: all three units match the written specification within the agreed tolerances, and the supplier corrects any differences you list.
Fail: the sample does not match the specification, or the supplier will not correct it. Fix the specification, re-sample once, and if the second sample still fails, move on — a factory that cannot make the sample cannot make the order.
Step 5: Verify Price and Cost Breakdown
A quotation is not one number. It is a list, and the cheapest list is usually the one that left the most lines out. Before you compare suppliers, make them quote the same thing — otherwise you are comparing a price that includes packaging and inspection against a price that includes neither.
What to ask for — an itemised quotation:
| Quote line | What it covers | What to check |
|---|---|---|
| Unit price | The goods themselves, at the quoted specification | Is it the same specification as the sample you approved? |
| Tooling / mould cost | Any mould, die, plate or setup charge | One-off or per order? Who owns the tooling? Is it credited on reorder? |
| Packaging | Retail box, carton, labelling, manual | Export-ready, or packed for the domestic market? |
| Inspection | Pre-shipment inspection cost | Included, or billed separately later? |
| Payment terms | Deposit percentage, balance trigger | 30/70, or 100% upfront? |
| Trade term | EXW, FOB, CIF, DDP | Which costs sit on your side of the line? |
| Lead time | Production days, from deposit or from sample approval | From which date, exactly? |
| Validity | How long the price holds | 7 days, 30 days — and what would change it? |
How to read the numbers:
- Compare like with like. Put two quotations side by side on the same specification, the same quantity, the same trade term and the same packaging standard. A price that is 30% below every competitor for the same product is a warning sign, not a bargain — check the material, the specification, and whether the product is actually the same.
- Ask what moves the price. Material grade, customisation, quantity, and season all move it. Custom colours, materials or branding typically add 10–25% to the base price. If the supplier cannot explain why the price is what it is, it cannot hold the price when production starts.
- Check the MOQ behind the price. MOQ is often quoted per style, but the real constraint is per colour, per fabric, or per size. Get all three in writing. A price quoted at 1,000 pieces does not apply to an order of 200.
- Watch the hidden lines. Inspection, packaging upgrades, export documentation, and bank charges are the lines that appear after the order is placed. Get them in the quotation before you pay the deposit.
Pass: the quotation is itemised, matches the approved sample specification, the trade term and lead time are stated, and the price is within a plausible range of other quotes for the same specification.
Fail: the supplier will not itemise, the price is far below every competitor with no explanation, or the specification in the quotation is vaguer than the specification you sent. Demand the breakdown in writing; if it does not come, do not pay.
Step 6: Agree Payment Terms and Contract
This is the step that protects your money. Everything before it was about the supplier; this step is about the transaction. A good supplier with bad paperwork is still a risk, because the paperwork is what you rely on when something goes wrong.
What the contract must contain, in writing:
- The parties. Full legal company names — the same names as the licence — for buyer and seller. Not a brand name, not a person's name, not a trading alias.
- The specification. The same written specification the sample was tested against, attached to the contract. A contract that says "as per sample" without attaching the specification is weaker than one that lists the numbers.
- Quantity, price, trade term, and lead time. All four, with the lead time counted from a named date — deposit received, or sample approved — not from a vague "after order confirmation."
- Payment milestones. The standard shape for a first order is 30% deposit against the confirmed order, with the remaining 70% paid after a pre-shipment inspection confirms the goods match the specification. Never pay 100% upfront to a supplier you have not bought from before, and never wire money to a personal bank account or to an account name that does not match the supplier's business licence.
- Inspection and claims. Who inspects, to what standard (agree an AQL level — see Step 7), and what happens if the goods fail: rework, replacement, or refund, and who pays for it. A contract with no claims clause is a contract that assumes nothing will go wrong.
- The bank account. The beneficiary name and account number, in the contract, matching the licence. Any change of bank details after the contract is signed must be confirmed by video or phone call, never by email alone.
Pass: the contract names the same legal company as the licence, attaches the specification, states the payment milestones and the inspection standard, and the bank account matches.
Fail: the supplier will not sign a contract, the contract names a different company, or the payment demand is 100% upfront to a personal account. Do not pay until the paperwork names the same company — and if it never does, walk away.
Step 7: Inspection Before Final Payment
The last step happens after production, and it protects the largest payment you will make. The 70% balance is your leverage. Once it is paid, the supplier has no reason to fix anything. Hold it until an inspection confirms the goods match the specification.
What to agree before production starts:
- The inspection standard. Agree an AQL (Acceptable Quality Level) in the contract — for most consumer goods, AQL 2.5 for major defects and 4.0 for minor defects is a common starting point, but the right level depends on your product and your market. The point is that the standard is agreed before production, not argued about after it.
- When the inspection happens. At 80–100% production completion, at the factory, before the goods are packed and loaded. An inspection after loading is an inspection of a sealed container.
- Who inspects. Either your own inspector, a third-party inspection company (SGS, Bureau Veritas, TÜV, Intertek, QIMA are the names most buyers use), or a sourcing agent acting on your instructions. The inspector must be independent of the supplier.
- What is checked. Quantity count, dimensions against the specification, material, function, finish, workmanship, packaging and labelling, and a random sample drawn to the agreed AQL. Photographs of the goods, the cartons, and the loaded container are part of the report.
What inspection costs. Market-reported inspection costs in China are roughly USD 150–300 per inspector-day for a standard pre-shipment inspection, and third-party factory audits are market-reported at roughly USD 300–900 per audit day depending on scope and travel. These are planning ranges from SERP sources — verify the current rate with your inspector before ordering.
When a third-party audit is worth paying for. Commission a full factory audit — not just a pre-shipment inspection — when the first order exceeds roughly USD 20,000, when a new mould or die is being cut (tooling money is the hardest to recover), when the product is safety-related, or when your customer requires traceability to source. Otherwise, the desk checks in Steps 1–3 plus a pre-shipment inspection are usually enough.
Pass: the inspection report shows the goods within the agreed AQL, the quantity matches, and the packaging and labelling are correct. Pay the balance.
Fail: the defect rate exceeds the agreed AQL, the quantity is short, or the goods do not match the specification. Hold the final payment, send the supplier the inspection report with photographs, and agree in writing whether the batch is reworked, replaced, or the order is cancelled with a refund of the deposit. Do not accept a verbal promise to "fix it at the next order."
What to Do If a Supplier Fails a Step
Not every failure means the same thing. Walk away immediately if the licence name or code does not match the registry, if the bank account belongs to a different name, if the registered status is cancelled or abnormal, or if the contract names a different company or demands 100% upfront — these failures are not fixable, and no document the supplier produces afterwards should be trusted without independent verification. Fixable once: a sample that fails the specification (fix the spec, re-sample once), capacity maths that does not support your quantity (reduce the order, split it, or extend the deadline), or a pre-shipment inspection that fails the agreed AQL (hold the balance; rework, replace, or cancel with a deposit refund — agreed in writing). Re-price and reconsider: a scope that is trading-only from a supplier that claimed to be a factory, a quotation that will not itemise, or a missing live factory video — give one specific second chance, then move on.
The scoring rule. Score each supplier on the seven steps before you choose. A supplier that passes Steps 1 and 2 but is weak on Step 3 is a candidate you can work with — with a smaller order. A supplier that fails Step 1 or Step 6 is not a candidate at any order size. And when two suppliers both pass all seven steps, choose the one whose sample was best, not the one whose price was lowest — a 5% price saving is worthless against a 20% defect rate.
Red Flags: When to Walk Away Immediately
- No business licence, or a licence that does not match the registry. A supplier that cannot show a licence is not a supplier; it is a website.
- Payment to a personal account, or a bank account that does not match the licence name. The money is not entering the company you think you are paying.
- 100% payment upfront, before any verification, with no inspection clause. The standard structure is a deposit with the balance tied to inspection. Full payment before the goods are even received removes all of your leverage.
- A quote far below every competitor, with no breakdown. It is not a bargain. It is a quote with lines missing, and the missing lines arrive as "adjustments" after the deposit is paid.
- Certificates with no number, another holder, or a different product. A PDF with a logo is not a certificate. Ask for the certificate number and check it with the issuing body — ISO 9001 certificates from major bodies such as SGS, TÜV and Bureau Veritas are searchable on the certifier's website.
- No factory video, no production address, no named contact. A supplier that will not show you where your goods are made is telling you something. Listen.
- Pressure to decide today. Prices move, but a supplier that needs your decision in an hour is selling urgency, not capacity.
- The specification keeps changing after your questions. If the material, the tolerance, or the packaging changes every time you ask, the supplier does not have a fixed product — it has a sales conversation.
FAQ
How long does it take to evaluate a supplier in China?
The free desk checks in Steps 1 and 2 take about an afternoon per supplier — roughly 2–6 hours including the registry lookup and the video call. Document checks against issuer databases take 1–5 working days, mostly waiting for issuers to reply. Sampling takes 1–3 weeks depending on the product. A full on-site factory audit takes one day on site plus travel, with the report in 1–3 days. Do the desk checks first: they remove most candidates before you spend any time or money on the rest.
Can I evaluate a supplier without visiting China?
Yes, for most of the work. Steps 1, 2, 5 and 6 are desk work — registry lookups, video calls, quotations and contracts — and they catch the majority of problems. What you cannot do remotely is a genuine on-site audit or a pre-shipment inspection: those need a person on the factory floor. For a first order, hire a third-party inspector for the pre-shipment inspection rather than skipping it. A live video call is useful evidence; it is not a substitute for an audit.
What is the difference between a factory audit and a pre-shipment inspection?
A factory audit checks the factory itself — production lines, equipment, raw materials, quality system, headcount, and whether the claimed capacity is real. It happens before the deposit on a first order or a large order. A pre-shipment inspection checks the finished goods — quantity, dimensions, function, finish, packaging — against the specification at 80–100% production, before the balance payment. The audit tells you whether the factory can make your order. The inspection tells you whether this batch was made right. You need both on a first order of any size.
How much does a factory audit cost in China?
Market-reported ranges put third-party factory audits at roughly USD 300–900 per audit day, depending on scope and travel, and standard pre-shipment inspections at roughly USD 150–300 per inspector-day. These are planning ranges from SERP sources — verify the current rate with your inspector before ordering. Commission a full audit when the first order exceeds roughly USD 20,000, when new tooling is being cut, when the product is safety-related, or when your customer requires traceability to source.
What should I do if my supplier fails the evaluation?
First, identify which step failed. A failed Step 1 (licence or bank account mismatch) or Step 6 (contract names a different company, 100% upfront demanded) is a walk-away — do not pay, and do not let the supplier "fix" it with a new document that has not been verified. A failed sample (Step 4) or failed capacity maths (Step 3) is usually fixable: re-sample once, reduce the order, or split it across two suppliers. A failed pre-shipment inspection (Step 7) means holding the balance and agreeing rework, replacement, or cancellation in writing. And if every supplier on your shortlist fails, the problem may be your shortlist — go back to sourcing with a clearer specification and a realistic price expectation.
Next Steps
Before your next order, do these five things:
- Shortlist two or three suppliers — not ten. Evaluation takes an afternoon per supplier, and ten afternoons is not a sourcing strategy.
- Run Steps 1 and 2 on all of them before you ask any of them for a sample. The registry and the scope line will remove at least one.
- Write your specification — dimensions, material, tolerances, packaging, standard — and send it before the sample is made.
- Agree the payment shape in writing — 30% deposit, 70% after a pre-shipment inspection — before the deposit is paid.
- Book the inspection before production finishes, not after the container is loaded.
If you can do all five yourself, in Chinese, with a Chinese payment route and a person on the ground for the inspection, you may not need an agent. If you cannot, that is exactly what an agent is for — running the evaluation, the sampling, the inspection, and the payment milestones as one job.
Already shortlisted a few suppliers? Tell SilkRoadSource what you are checking. Send your supplier shortlist, product specifications, quantities, and destination market, and we will come back with an evaluation check — licence and identity, factory or trader, capability, samples, price breakdown, and the inspection steps before your final payment.
Turn the Sourcing Checklist Into a Real Supplier Program.
Send us your product list, supplier quotation or sourcing requirement. SilkRoadSource can help with supplier sourcing, quality inspection, order consolidation, private label and China-side shipping coordination.
Discuss Your Sourcing Project →