Every year thousands of companies figure out how to import products from China by improvising — and most of the expensive mistakes trace back to the same handful of decisions made carelessly in the first weeks. This guide organizes the entire import process the way a professional buyer actually experiences it: not as a checklist of steps, but as seven decisions. Each decision has a wrong answer that costs money quietly and a right answer that compounds across every order that follows.
Key takeaways:
- Importing from China is a sequence of decisions — what, from whom, on what terms, how paid, how verified, how shipped, how cleared — and each one has a specific failure mode.
- A written specification before the first supplier conversation is the highest-leverage hour in the entire process.
- Payment structure and quality inspection are the two control points where a buyer still holds leverage; both sit before the balance payment.
- Landed cost — not factory price — is the only number that matters, and it is calculable before the first deposit.
How to Import Products From China: Seven Decisions, Not Seven Steps
Most guides present importing as a linear tutorial: find a supplier, order samples, place the order, ship, clear customs. The sequence is correct, but it hides where the real choices are. Between those steps sit seven decisions that determine whether the shipment makes money:

| # | Decision | What it determines | Typical failure when rushed |
|---|---|---|---|
| 1 | What exactly you are buying | Price comparability, QC reference | Vague quotes, quality disputes |
| 2 | Who you buy it from | Cost structure, reliability, export readiness | Fraud, middleman surprises |
| 3 | On what trade terms | Who pays for what, who carries risk | Surprise costs at origin |
| 4 | How you pay | Leverage before production | No recourse on defects |
| 5 | How you verify quality | Defect rate at receiving | A container of unsellable stock |
| 6 | How the goods move | Freight cost per unit, arrival timing | Freight eats the margin |
| 7 | How goods clear customs | Landed cost, compliance risk | Delays, penalties, seized goods |
Treat each decision as a gate with a written output — a specification, a verified supplier file, a contract, an inspection report, a booking, an entry summary. The guide to sourcing products from China covers the earlier sourcing-path choice in depth; here we assume a product or basket is chosen and walk the full import chain from specification to delivery.
Decision 1: What Exactly You Are Buying
The specification is the contract's anchor and the inspector's reference. Before contacting anyone, write a one-page spec per product:

- Function and dimensions — what it does, exact size, weight, tolerances where they matter.
- Materials and grade — not "plastic" but PP, ABS, or PET, with thickness or density.
- Colors and finish — Pantone or physical reference samples, not adjectives.
- Packaging — retail box artwork, inner carton counts, master carton dimensions and gross weight.
- Labeling and compliance — destination-market requirements: language, safety marks, origin marking.
Two specifications matter more than buyers expect. First, the golden sample: once a pre-production sample is approved, sign or seal it and treat it as the physical specification — every later inspection judges mass production against it. Second, the master carton spec: carton dimensions and weight determine freight cost per unit, and a product that ships inefficiently can lose its entire price advantage. Buyers using custom branding and packaging should fix logo placement, print colors and packaging construction in the same document, because packaging changes mid-production are a classic source of delay and defect.
Decision 2: Who You Buy From
Supplier verification is where importers either protect the whole project or expose it. The core checks are documentable and quick:

| Check | How | What it screens out |
|---|---|---|
| Business license | Verify company name, scope, registration date against official records | Shells and resellers posing as factories |
| Name-match on bank account | The payee must match the license exactly, in writing | Deposit diversion fraud |
| Factory evidence | Live video walk-through or third-party audit; production photos of your actual product | Trading companies pretending to own lines |
| Export track record | Ask for bill-of-lading copies or export references from your market | Suppliers who have never exported |
| Sample quality | Paid samples tested against your written spec | Catalog-photo sellers |
One habit prevents most import fraud: never wire a deposit to an account whose name differs from the contracted company. A supplier that resists verification — no video visit, no audit, vague about whether it manufactures — has told you what it is. Where the buying list is long or the market is new, a professional product sourcing service runs this verification across candidate suppliers as its core job, and the broader channel landscape — marketplaces, 1688, wholesale markets — is mapped in the guide to China wholesale websites.
Decision 3: On What Trade Terms
Trade terms (Incoterms) allocate cost and risk between you and the supplier. The three that matter for most China imports:
- EXW (Ex Works). You handle everything from the factory gate: pickup, export clearance, freight. Cheapest quoted price, most work, and the right choice only when you already have an origin-side logistics partner.
- FOB (Free on Board). The supplier delivers goods cleared for export onto the vessel at the named port; you take over from there. For most B2B importers this is the correct default — it keeps freight control with you while leaving export formalities with the party that speaks the system.
- CIF / CFR. The supplier arranges freight to your port. Convenient, but you accept the supplier's freight pricing and forwarder — which removes your leverage over a cost line that can move 30% with market cycles.
A full worked comparison of the four terms, including when DDP makes sense, is covered separately in the guide to EXW vs FOB vs CIF vs DDP. The decision rule at this stage: FOB unless you have a specific reason, and never let "we usually ship CIF" pass without pricing the same lane yourself — freight quotes arranged by the supplier are frequently above market.
Decision 4: How You Pay — and Keep Leverage
Payment structure is leverage. Once the balance is paid, every quality problem becomes a negotiation. The common structures:

| Structure | Typical split | Protection level | Use when |
|---|---|---|---|
| T/T deposit + balance | 30% / 70% before shipment | Medium — tie balance to inspection | Standard for verified suppliers |
| T/T against B/L copy | 30% / 70% after loading | Lower for the buyer's QC leverage | Repeat orders, trusted suppliers |
| Letter of Credit | Bank-guaranteed on documents | High, costly and document-sensitive | Large first orders, new counterparties |
| Escrow / platform pay | Held until receipt confirmed | High for small orders | Marketplace transactions |
The single most valuable clause is simple: the balance payment is released only after the pre-shipment inspection passes. That one sentence converts inspection from an expense into control. Add the spec, the golden sample reference, quality tolerance (an AQL level is standard practice) and a delivery date into a written purchase order — verbal agreements and WeChat messages have no force when a dispute appears.
Decision 5: How You Verify Quality Before Shipment
Quality control has three checkpoints, and the one importers skip is the one that matters:

- During production (optional, high-risk products). A check when 20–50% of goods are finished catches systemic defects while there is still time to correct the line.
- Pre-shipment inspection (non-negotiable). When goods are 100% produced and at least 80% packed, an inspector draws a random sample per the agreed AQL and checks workmanship, function, dimensions, color against the golden sample, packaging and carton marks. Cost is a few hundred dollars per man-day; a failed container costs thousands.
- Consolidated intake check (multi-supplier orders). When goods arrive at a consolidation warehouse, verify each supplier's cartons against the packing list — quantities, labels, condition — before anything is loaded. This catches short-shipments and substitutions that factory-side checks cannot see.
For multi-SKU or multi-supplier baskets, inspection is organized by risk tier rather than one flat standard — the approach is detailed in the guide to multi-supplier sourcing. A managed quality inspection process provides the inspectors, AQL protocols and photo reporting as a service, and for buyers assembling goods from several factories the check happens at the consolidation warehouse before loading, not after arrival.
Decision 6: How the Goods Move
Freight is the cost line where unmanaged imports quietly lose their margin. The decision has two layers:

Mode. Sea freight is the default for B2B volume — roughly 25–45 days port-to-port to most markets at a fraction of air cost. Air freight (3–10 days) is for samples, urgent replenishment and high-value-density goods. Rail sits between for Central Asia and Europe lanes.
Volume. A full container (FCL) prices per box; less-than-container (LCL) prices per cubic meter with origin and destination handling fees attached. Small and mixed orders have a third option: consolidation, where goods from multiple suppliers are combined into one shipment under one set of documents. For orders below roughly 15 CBM, a managed consolidated shipment is frequently cheaper per unit than raw LCL — the arithmetic is worked through in LCL vs consolidated shipping and the loading logic in mixed container shipping from China. For buyers building small mixed baskets in the first place, the companion guide to low MOQ mixed products from China covers that order shape end to end.
Two scheduling rules prevent most freight pain. First, book freight after the production date is contractual, not before — cutoff dates discipline suppliers. Second, avoid Chinese New Year: factories stop two to four weeks and every booking around it competes for space at peak rates. A shipping support service handles booking, documentation and cutoff management as one flow, with the warehouse-side mechanics explained in China warehouse consolidation.
Decision 7: How Goods Clear Customs and Land at Cost
Customs is where the landed cost is finally fixed. The mechanics:
- HS classification. Every product has a Harmonized System code that determines duty rate and regulatory treatment. Classify before ordering — the code may reveal restrictions, anti-dumping duties or licensing requirements that change the product decision itself.
- Documents. Commercial invoice, packing list, bill of lading or air waybill, certificate of origin where it earns a preference rate, and any product certificates the destination market requires. Values must be consistent across all documents; discrepancies are the most common cause of customs holds.
- Duties and taxes. Duty is assessed on the declared customs value (for most markets, the transaction value including certain costs), plus import VAT or GST at destination. Rates are public; calculate them before the first deposit, not at arrival.
- Entry filing. A licensed customs broker files the entry, pays duties and arranges release. Errors in description, value or HS code surface here — months after production, when fixing them is most expensive.
Compliance is not an arrival-day topic. Products with electrical components, food contact, children's use or chemical content carry destination-specific requirements that must be built into the specification at Decision 1. An import that treats compliance as paperwork arrives with goods it cannot legally sell.
The Landed Cost Ledger: A Worked Example
Factory price is perhaps two-thirds of what an imported product actually costs. A disciplined buyer builds the full ledger before committing:

| Line item | Example (mixed 8 CBM order) | Share of landed cost |
|---|---|---|
| Products (FOB value) | $10,000 | ~59% |
| Inland haulage + export handling | $500 | ~3% |
| Sea freight (consolidated LCL) | $1,600 | ~9% |
| Insurance | $60 | ~0.5% |
| Import duty (say 6.5% of customs value) | ~$760 | ~4.5% |
| Import VAT / GST (destination rate) | ~$2,200 | ~13% |
| Customs entry, port and delivery fees | ~$550 | ~3% |
| Inspection (2 man-days) | $600 | ~3.5% |
| Landed cost total | ~$17,270 | 100% |
The gap between the $10,000 factory price and the ~$17,270 landed cost is not friction — it is the real cost structure of importing, and every line is knowable in advance. Two habits follow. First, quote your own market from landed cost, never from FOB. Second, re-price the freight line each order: it moves with market cycles and is the line you most directly control through mode and consolidation choices.
Common Failure Points (and the Decision That Prevents Each)
The recurring losses in China importing map cleanly onto the seven decisions:
- Quality dispute with no recourse → Decision 4: balance paid before inspection.
- Deposit fraud → Decision 2: payee name not matching the contract.
- Vague-quote price creep → Decision 1: no written spec, so every quote describes a different product.
- Freight surprise at booking → Decision 6: carton spec never fixed, so volume was unknown.
- Customs hold → Decision 7: inconsistent invoice values or missing certificates.
- Late arrival for a season → Decision 6: production date never made contractual.
- Goods that cannot be sold legally → Decision 1: destination-market requirements never checked.
None of these failures is exotic. All seven are prevented by written outputs at the corresponding decision gate — which is the entire argument for running imports as decisions rather than steps.
A 90-Day Plan for a First Order
A realistic first-order timeline from decision to delivery:
| Phase | Weeks | Milestones |
|---|---|---|
| Define | 1–2 | Written specs, landed-cost model, compliance check, HS codes |
| Source | 3–5 | Supplier shortlist, verification file, paid samples, golden sample approved |
| Contract | 6–7 | PO with spec, terms, payment tied to inspection; deposit paid |
| Produce | 8–11 | Production window; during-production check for high-risk items |
| Verify & ship | 12–14 | Pre-shipment inspection passed, balance released, freight booked, goods consolidated and loaded |
| Clear & receive | 15–18 | Documents to broker, duties paid, customs release, delivery |
The schedule assumes sea freight and normal production lead times; air freight compresses the last phase, and Chinese New Year inserts a two-to-four-week pause anywhere it lands. First orders run slower than repeat orders — the verification work is front-loaded and reused forever.
Next Step
The seven decisions compress into one principle: write everything down before money moves — the spec, the verified supplier file, the contract terms, the inspection standard, the freight plan, the duty calculation. Importers who adopt that discipline rarely meet the classic disasters, and every subsequent order gets cheaper to manage because the framework is already built. When the product list is defined, the fastest route to verified suppliers, consolidated shipments and inspected, documented deliveries is a single accountable partner — start with the wholesalers program or the distributors program depending on order size, or reach the team directly through the contact page.
Ready to source from China through one accountable partner?
SilkRoadSource verifies suppliers, consolidates mixed orders and ships door to door to Central Asia. Tell us what you need and we will quote it line by line.
- Low MOQ & mixed SKU — trial orders from several suppliers.